Whole Home Renovation
Residential

Whole Home Renovation in Ottawa

Renew the home through one coordinated plan that aligns layout changes, building systems, finishes, sequencing, and final delivery.

Ideal forHomeowner, Landlord, Real Estate Investor
Typical active construction8–14 weeksDesign decisions, permits, procurement, and active construction are separate phases. Timing is confirmed after the site review and scope definition.
DeliveryPlanned and managed by Meiju
4.3 on GoogleBased on 11 public reviews
Fully insuredDocumentation available
WSIB coveredProfessional jobsite coverage
Ottawa basedServing Ottawa and nearby areas
The outcome

One coherent plan for the entire home.

Meiju reviews the property, defines the whole home renovation scope, sequences the trades and decisions, and manages delivery through final handoff. You get one accountable path from the existing conditions to the finished result.

Meiju delivers this service across Ottawa and the surrounding area, planning around the home, existing conditions, access, material decisions, and permit requirements where they apply.

A good fit when

You want one clear renovation path

  • The work involves connected layouts, trades, finishes, or decisions.
  • You want scope and sequencing resolved before construction starts.
  • You prefer one accountable team through final handoff.
Typical priorities

What clients want addressed

  • Overall layout
  • Building systems
  • Room-to-room consistency
  • Material selections
  • Phasing and occupancy
  • Permits and inspections
Planning considerations

What matters most in whole home renovation

It aligns room upgrades, building systems, and finishes under one plan so improvements feel intentional rather than assembled through disconnected projects.

How it works

From renovation idea to final handoff

01

Discuss the renovation

Share the property, desired result, priorities, and timing.

02

Review the conditions

We assess the existing space, access, constraints, and decisions that shape the work.

03

Define the project

Scope, sequence, budget, permits, materials, and responsibilities are confirmed.

04

Build and hand over

Meiju manages the work through inspections, completion, and final review.

Complete Scope

Explore the complete scope.

Review the work that can be included. Final scope is confirmed after assessing the property, existing conditions, and project priorities.

98 Documented scope items

Included scopePlanning & Project Coordination

6 items

Site Assessment

Reviews the property, existing conditions, access, and project goals to define the work required.

Project Planning

Organizes the proposed scope, sequence, schedule, and key project requirements.

Design Consultation

Reviews layout, function, finishes, and design priorities with the client.

Material Procurement

Coordinates the sourcing, ordering, and delivery planning of project materials.

Permit Assistance

Helps identify permit needs and coordinate the documents and submission steps within the agreed scope.

Project Management

Coordinates scheduling, trades, site communication, progress, and project administration.

Included scopeProperty Protection & Cleanup

7 items

Selective Demolition

Carefully removes only the identified finishes, fixtures, or non-structural components while protecting surrounding areas.

Interior Demolition

Removes interior finishes, fixtures, and non-structural assemblies within the project area.

Floor Removal

Removes the existing floor finish and accessible associated materials.

Ceiling Removal

Removes the ceiling finish or non-structural ceiling assembly and prepares the area for the next stage.

Wall Removal

Removes an non-load-bearing wall and related finishes within the project area.

Debris Removal

Collects and removes non-hazardous construction debris generated by the agreed work.

Construction Cleaning

Removes construction dust and debris and cleans accessible surfaces in the completed work area.

Included scopeFraming & Structural

5 items

Interior Wall Framing

Builds non-load-bearing interior and basement wall framing with required openings for the layout.

Ceiling Framing

Builds or adjusts ceiling framing and required backing for the planned finished assembly.

Bulkhead Framing

Builds a framed enclosure around ducts, pipes, beams, or other building elements.

Structural Framing

Builds or modifies framing that forms part of an structural design.

Structural Reinforcement

Adds framing, posts, blocking, or other structural components to strengthen an existing assembly.

Included scopeInsulation & Building Envelope

5 items

Batt Insulation

Installs batt insulation in prepared wall, floor, or ceiling cavities.

Blown-In Insulation

Installs loose-fill insulation in prepared attic areas or enclosed cavities.

Spray Foam Insulation

Applies spray foam insulation to prepared cavities, rim joists, or other areas.

Soundproofing

Installs acoustic insulation or sound-control materials within a prepared assembly.

Vapour Barrier Installation

Installs and seals an vapour-control membrane over a prepared insulated assembly.

Included scopePlumbing

16 items

Plumbing Rough-In

Installs or modifies concealed water, drain, and vent connections for the layout.

Plumbing Repair

Diagnoses and repairs accessible plumbing components.

Water Line Installation

Installs or extends an water supply line and required connections.

Drain Installation

Installs or extends an drain and related connections.

Faucet Installation

Installs and connects a faucet, then checks operation and accessible connections for leaks.

Sink Installation

Installs and connects a sink, drain, and water supply components.

Toilet Installation

Installs and connects a toilet, then tests flushing and accessible seals.

Vanity Installation

Installs and secures a bathroom vanity and coordinates its accessible connections.

Bathtub Installation

Installs and connects a bathtub in a prepared area.

Shower Installation

Installs and connects the shower base, enclosure components, and accessible plumbing fixtures.

Shower Door Installation

Installs and adjusts a shower door or enclosure on a prepared opening.

Water Heater Installation

Installs and connects a storage water heater and completes basic startup checks.

Tankless Water Heater Installation

Installs and connects a tankless water heater and completes basic startup checks.

Sump Pump Installation

Installs and connects a sump pump and discharge components in a prepared sump.

Water Softener Installation

Installs and connects a water softener to prepared plumbing and drainage.

Shut-Off Valve Replacement

Removes an accessible shut-off valve and installs and tests a replacement.

Included scopeElectrical

15 items

Electrical Rough-In

Installs or modifies concealed wiring, boxes, and connection points for the planned layout.

Electrical Repair

Diagnoses and repairs accessible electrical components.

Electrical Panel Upgrade

Replaces or upgrades an electrical panel and coordinates circuit connections.

Circuit Installation

Installs a new electrical circuit from the panel to the required connection point.

Outlet Installation

Installs and connects an electrical outlet in a prepared location.

Switch Installation

Installs and connects an switch or control in a prepared location.

Pot Light Installation

Installs and connects recessed light fixtures in prepared ceiling locations.

Light Fixture Installation

Installs and connects a light fixture at a prepared electrical location.

Ceiling Fan Installation

Installs, secures, and connects a ceiling fan at a prepared location.

Exhaust Fan Installation

Installs and connects a exhaust fan and venting where included.

Smoke & CO Detector Installation

Installs and tests smoke and carbon monoxide detection equipment.

Thermostat Installation

Installs and configures a thermostat for the existing HVAC system.

Interior LED Light Strip Installation

Installs and connects a LED light strip system at a prepared interior location.

Exterior LED Light Strip Installation

Installs and connects a weather-rated LED light strip system at a prepared exterior location.

Cabinet LED Light Installation

Installs and connects LED lighting at prepared cabinets or millwork.

Included scopeHVAC

7 items

HVAC Rough-In

Installs or modifies concealed ducts, lines, vents, and HVAC connection points.

Furnace Installation

Installs and connects a furnace and completes basic startup and operation checks.

Heat Pump Installation

Installs and connects a heat pump system and completes basic commissioning.

Air Conditioner Installation

Installs and connects a air-conditioning system and completes basic startup checks.

Duct Installation

Installs or extends ductwork to serve the required area.

Cold Air Return Installation

Installs or extends a cold-air return and connects it to ductwork.

HRV Installation

Installs and connects a heat recovery ventilator and associated duct connections.

Included scopeDrywall & Finishes

8 items

Drywall Installation

Installs drywall panels on prepared wall or ceiling framing.

Moisture Resistant Drywall

Installs moisture-resistant drywall on prepared framing in damp-area locations.

Drywall Finishing

Tapes, compounds, sands, and prepares drywall joints and fasteners for paint or another finish.

Drywall Repair

Repairs damaged drywall and prepares the affected area for finishing.

Interior Painting

Prepares and paints the interior walls, ceilings, trim, or other selected surfaces.

Cabinet Painting

Prepares and paints cabinet doors, faces, and accessible components.

Trim Painting

Prepares and paints selected baseboards, casing, moulding, or other trim.

Ceiling Painting

Prepares and paints the selected interior ceiling surface.

Included scopeFlooring

15 items

Vinyl Flooring

Installs selected vinyl plank, tile, or sheet flooring over a prepared substrate.

Laminate Flooring

Installs selected laminate flooring and underlayment over a prepared substrate.

Hardwood Flooring

Installs selected solid hardwood flooring over a suitable prepared substrate.

Engineered Hardwood Flooring

Installs selected engineered hardwood over a suitable prepared substrate.

Tile Flooring

Installs and grouts selected floor tile over a properly prepared substrate.

Carpet Installation

Installs selected carpet and underpad in the area.

Floor Levelling

Corrects low spots or uneven areas to create a suitable surface for new flooring.

Underlayment Installation

Installs the underlayment over a prepared substrate.

Subfloor Installation

Installs subfloor panels over prepared framing or an base.

Floor Tile Installation

Installs and grouts selected floor tile over a prepared substrate.

Wall Tile Installation

Installs and grouts selected tile on a prepared wall surface.

Shower Tile Installation

Installs and grouts selected tile over a prepared shower waterproofing system.

Backsplash Installation

Installs and grouts selected backsplash tile over a prepared wall surface.

Tile Repair

Repairs or replaces localized damaged tile and restores the surrounding grout.

Tile Regrouting

Removes deteriorated surface grout where required and applies new grout to selected joints.

Included scopeDoors & Trim

10 items

Interior Door Installation

Installs, aligns, and adjusts an interior door and hardware.

Window Installation

Installs, flashes, seals, and finishes a window in a prepared opening.

Window Replacement

Replaces existing exterior windows, including removal, installation, sealing, flashing, and finishing where required by the confirmed scope.

Baseboard Installation

Installs and prepares selected baseboard trim at finished wall and floor transitions.

Trim Installation

Installs and prepares selected casing, moulding, or finish trim.

Shelving Installation

Installs and secures shelving with supports suited to the wall and intended use.

Closet Installation

Installs closet shelving, rods, organizers, or related components.

Cabinet Installation

Installs, aligns, and secures prefabricated cabinets.

Countertop Installation

Installs and secures an countertop on prepared cabinets or supports.

Crown Moulding Installation

Installs and prepares crown moulding at the wall and ceiling transition.

Included scopeExterior & Structural

4 items

Kitchen Demolition

Removes the kitchen components, such as cabinets, counters, fixtures, and finishes.

Bathroom Demolition

Removes the bathroom fixtures, finishes, and assemblies.

Tile Removal

Removes existing tile, grout, and accessible setting material from the selected area.

Cabinet Removal

Removes existing cabinets and accessible attachments while protecting adjacent surfaces.

Questions

Before you begin

Detailed answers are here when you need them. Open a question to learn more.

What is included in this service?

Work can include Selective Demolition, Interior Demolition, Kitchen Demolition, Bathroom Demolition, Floor Removal, and Ceiling Removal. The final proposal confirms the selected services, quantities, site conditions, and any exclusions for your property.

How long does the work usually take?

A ready-to-start basic-to-standard scope typically takes 8–14 weeks. Site conditions, selections, permits, inspections, weather, access, and approved changes can affect the schedule.

Can we remain in the home during construction?

That depends on safe access, working bathrooms and kitchens, utility shutdowns, dust control, and the number of rooms affected. Major whole-home work often requires temporary relocation during the most disruptive stages.

How is pricing calculated?

Pricing is built from the selected services using hourly, project-based, per-square-foot, and per-room rates, as applicable to the measured scope. Design-dependent or concealed work may require a custom quotation. The final proposal confirms quantities and approved choices.

Can a whole-home renovation be completed in phases?

Yes. Phasing can reduce the amount of the home affected at one time, but it may extend the overall schedule and create repeat mobilization. We compare phasing with a continuous project before the scope is finalized.

How are finish selections kept consistent throughout the home?

Key flooring, paint, trim, cabinetry, hardware, and fixture decisions are organized before their installation dates. Transitions between retained and renovated areas are reviewed as part of the design and scope.

Your renovation

Tell us what you want to change.

Share the property, desired result, priorities, and timing so we can understand the renovation you are considering.

We review the request before proposing work.
We’ll recommend the appropriate scope and next step.
No obligation and no mailing-list signup.