Discuss the renovation
Share the property, desired result, priorities, and timing.
Turn an unfinished basement into comfortable, code-compliant living space with coordinated planning, construction, finishing, and closeout.
Meiju reviews the property, defines the basement finishing scope, sequences the trades and decisions, and manages delivery through final handoff. You get one accountable path from the existing conditions to the finished result.
Meiju delivers this service across Ottawa and the surrounding area, planning around the home, existing conditions, access, material decisions, and permit requirements where they apply.
It converts underused lower-level space into comfortable living area while addressing moisture, insulation, services, and safe room planning before finishes conceal them.
Share the property, desired result, priorities, and timing.
We assess the existing space, access, constraints, and decisions that shape the work.
Scope, sequence, budget, permits, materials, and responsibilities are confirmed.
Meiju manages the work through inspections, completion, and final review.
Review the work that can be included. Final scope is confirmed after assessing the property, existing conditions, and project priorities.
Site Assessment
Reviews the property, existing conditions, access, and project goals to define the work required.
Project Planning
Organizes the proposed scope, sequence, schedule, and key project requirements.
Design Consultation
Reviews layout, function, finishes, and design priorities with the client.
Material Procurement
Coordinates the sourcing, ordering, and delivery planning of project materials.
Permit Assistance
Helps identify permit needs and coordinate the documents and submission steps within the agreed scope.
Project Management
Coordinates scheduling, trades, site communication, progress, and project administration.
Selective Demolition
Carefully removes only the identified finishes, fixtures, or non-structural components while protecting surrounding areas.
Interior Demolition
Removes interior finishes, fixtures, and non-structural assemblies within the project area.
Floor Removal
Removes the existing floor finish and accessible associated materials.
Ceiling Removal
Removes the ceiling finish or non-structural ceiling assembly and prepares the area for the next stage.
Wall Removal
Removes an non-load-bearing wall and related finishes within the project area.
Debris Removal
Collects and removes non-hazardous construction debris generated by the agreed work.
Construction Cleaning
Removes construction dust and debris and cleans accessible surfaces in the completed work area.
Interior Wall Framing
Builds non-load-bearing interior and basement wall framing with required openings for the layout.
Ceiling Framing
Builds or adjusts ceiling framing and required backing for the planned finished assembly.
Bulkhead Framing
Builds a framed enclosure around ducts, pipes, beams, or other building elements.
Structural Framing
Builds or modifies framing that forms part of an structural design.
Structural Reinforcement
Adds framing, posts, blocking, or other structural components to strengthen an existing assembly.
Batt Insulation
Installs batt insulation in prepared wall, floor, or ceiling cavities.
Spray Foam Insulation
Applies spray foam insulation to prepared cavities, rim joists, or other areas.
Soundproofing
Installs acoustic insulation or sound-control materials within a prepared assembly.
Vapour Barrier Installation
Installs and seals an vapour-control membrane over a prepared insulated assembly.
Plumbing Rough-In
Installs or modifies concealed water, drain, and vent connections for the layout.
Water Line Installation
Installs or extends an water supply line and required connections.
Drain Installation
Installs or extends an drain and related connections.
Sump Pump Installation
Installs and connects a sump pump and discharge components in a prepared sump.
Vanity Installation
Installs and secures a bathroom vanity and coordinates its accessible connections.
Electrical Rough-In
Installs or modifies concealed wiring, boxes, and connection points for the planned layout.
Electrical Repair
Diagnoses and repairs accessible electrical components.
Electrical Panel Upgrade
Replaces or upgrades an electrical panel and coordinates circuit connections.
Circuit Installation
Installs a new electrical circuit from the panel to the required connection point.
Outlet Installation
Installs and connects an electrical outlet in a prepared location.
Switch Installation
Installs and connects an switch or control in a prepared location.
Pot Light Installation
Installs and connects recessed light fixtures in prepared ceiling locations.
Light Fixture Installation
Installs and connects a light fixture at a prepared electrical location.
Ceiling Fan Installation
Installs, secures, and connects a ceiling fan at a prepared location.
Exhaust Fan Installation
Installs and connects a exhaust fan and venting where included.
Smoke & CO Detector Installation
Installs and tests smoke and carbon monoxide detection equipment.
Thermostat Installation
Installs and configures a thermostat for the existing HVAC system.
Interior LED Light Strip Installation
Installs and connects a LED light strip system at a prepared interior location.
HVAC Rough-In
Installs or modifies concealed ducts, lines, vents, and HVAC connection points.
Duct Installation
Installs or extends ductwork to serve the required area.
Cold Air Return Installation
Installs or extends a cold-air return and connects it to ductwork.
HRV Installation
Installs and connects a heat recovery ventilator and associated duct connections.
Drywall Installation
Installs drywall panels on prepared wall or ceiling framing.
Moisture Resistant Drywall
Installs moisture-resistant drywall on prepared framing in damp-area locations.
Drywall Finishing
Tapes, compounds, sands, and prepares drywall joints and fasteners for paint or another finish.
Interior Painting
Prepares and paints the interior walls, ceilings, trim, or other selected surfaces.
Trim Painting
Prepares and paints selected baseboards, casing, moulding, or other trim.
Ceiling Painting
Prepares and paints the selected interior ceiling surface.
Vinyl Flooring
Installs selected vinyl plank, tile, or sheet flooring over a prepared substrate.
Laminate Flooring
Installs selected laminate flooring and underlayment over a prepared substrate.
Hardwood Flooring
Installs selected solid hardwood flooring over a suitable prepared substrate.
Engineered Hardwood Flooring
Installs selected engineered hardwood over a suitable prepared substrate.
Tile Flooring
Installs and grouts selected floor tile over a properly prepared substrate.
Carpet Installation
Installs selected carpet and underpad in the area.
Floor Levelling
Corrects low spots or uneven areas to create a suitable surface for new flooring.
Underlayment Installation
Installs the underlayment over a prepared substrate.
Subfloor Installation
Installs subfloor panels over prepared framing or an base.
Interior Door Installation
Installs, aligns, and adjusts an interior door and hardware.
Window Installation
Installs, flashes, seals, and finishes a window in a prepared opening.
Window Replacement
Replaces existing exterior windows, including removal, installation, sealing, flashing, and finishing where required by the confirmed scope.
Baseboard Installation
Installs and prepares selected baseboard trim at finished wall and floor transitions.
Trim Installation
Installs and prepares selected casing, moulding, or finish trim.
Closet Installation
Installs closet shelving, rods, organizers, or related components.
Cabinet Installation
Installs, aligns, and secures prefabricated cabinets.
Crown Moulding Installation
Installs and prepares crown moulding at the wall and ceiling transition.
Detailed answers are here when you need them. Open a question to learn more.
Work can include Selective Demolition, Interior Demolition, Floor Removal, Ceiling Removal, Wall Removal, and Debris Removal. The final proposal confirms the selected services, quantities, site conditions, and any exclusions for your property.
A ready-to-start basic-to-standard scope typically takes 3–6 weeks. Site conditions, selections, permits, inspections, weather, access, and approved changes can affect the schedule.
Yes, when the linked plumbing, ventilation, electrical, and finishing services suit the property. Layout, drainage, permits, and fixture selections must be confirmed before work starts.
Pricing is built from the selected services using hourly, project-based, per-square-foot, and per-linear-foot rates, as applicable to the measured scope. Design-dependent or concealed work may require a custom quotation. The final proposal confirms quantities and approved choices.
Visible moisture, drainage concerns, and substrate conditions are reviewed before concealed finishes are installed. Required remediation or waterproofing must be resolved or added to the approved scope first.
The required assembly is selected for the location, existing construction, and permitted design. Applicable energy, fire, and building requirements are verified for the final scope.
Share the property, desired result, priorities, and timing so we can understand the renovation you are considering.