Home Accessibility Renovation
Residential

Home Accessibility Renovation in Ottawa

Adapt the home for safer, easier daily use through thoughtful changes to access, circulation, bathrooms, fixtures, and living spaces.

Ideal forHomeowner, Landlord
Typical active construction3–10 business daysDesign decisions, permits, procurement, and active construction are separate phases. Timing is confirmed after the site review and scope definition.
DeliveryPlanned and managed by Meiju
4.3 on GoogleBased on 11 public reviews
Fully insuredDocumentation available
WSIB coveredProfessional jobsite coverage
Ottawa basedServing Ottawa and nearby areas
The outcome

Safer daily living without compromising the home.

Meiju reviews the property, defines the home accessibility renovation scope, sequences the trades and decisions, and manages delivery through final handoff. You get one accountable path from the existing conditions to the finished result.

Meiju delivers this service across Ottawa and the surrounding area, planning around the home, existing conditions, access, material decisions, and permit requirements where they apply.

A good fit when

You want one clear renovation path

  • The work involves connected layouts, trades, finishes, or decisions.
  • You want scope and sequencing resolved before construction starts.
  • You prefer one accountable team through final handoff.
Typical priorities

What clients want addressed

  • Safe access
  • Clear circulation
  • Bathroom usability
  • Reach and controls
  • Lighting and contrast
  • Future daily needs
Planning considerations

What matters most in home accessibility renovation

It removes practical barriers and improves safe daily use without treating accessibility as an afterthought or a collection of isolated products.

How it works

From renovation idea to final handoff

01

Discuss the renovation

Share the property, desired result, priorities, and timing.

02

Review the conditions

We assess the existing space, access, constraints, and decisions that shape the work.

03

Define the project

Scope, sequence, budget, permits, materials, and responsibilities are confirmed.

04

Build and hand over

Meiju manages the work through inspections, completion, and final review.

Complete Scope

Explore the complete scope.

Review the work that can be included. Final scope is confirmed after assessing the property, existing conditions, and project priorities.

51 Documented scope items

Included scopePlanning & Project Coordination

6 items

Site Assessment

Reviews the property, existing conditions, access, and project goals to define the work required.

Project Planning

Organizes the proposed scope, sequence, schedule, and key project requirements.

Design Consultation

Reviews layout, function, finishes, and design priorities with the client.

Material Procurement

Coordinates the sourcing, ordering, and delivery planning of project materials.

Permit Assistance

Helps identify permit needs and coordinate the documents and submission steps within the agreed scope.

Project Management

Coordinates scheduling, trades, site communication, progress, and project administration.

Included scopeProperty Protection & Cleanup

5 items

Selective Demolition

Carefully removes only the identified finishes, fixtures, or non-structural components while protecting surrounding areas.

Floor Removal

Removes the existing floor finish and accessible associated materials.

Wall Removal

Removes an non-load-bearing wall and related finishes within the project area.

Debris Removal

Collects and removes non-hazardous construction debris generated by the agreed work.

Construction Cleaning

Removes construction dust and debris and cleans accessible surfaces in the completed work area.

Included scopeFraming & Structural

2 items

Interior Wall Framing

Builds non-load-bearing interior and basement wall framing with required openings for the layout.

Structural Reinforcement

Adds framing, posts, blocking, or other structural components to strengthen an existing assembly.

Included scopePlumbing

8 items

Plumbing Rough-In

Installs or modifies concealed water, drain, and vent connections for the layout.

Faucet Installation

Installs and connects a faucet, then checks operation and accessible connections for leaks.

Sink Installation

Installs and connects a sink, drain, and water supply components.

Toilet Installation

Installs and connects a toilet, then tests flushing and accessible seals.

Vanity Installation

Installs and secures a bathroom vanity and coordinates its accessible connections.

Bathtub Installation

Installs and connects a bathtub in a prepared area.

Shower Installation

Installs and connects the shower base, enclosure components, and accessible plumbing fixtures.

Shower Door Installation

Installs and adjusts a shower door or enclosure on a prepared opening.

Included scopeElectrical

5 items

Electrical Rough-In

Installs or modifies concealed wiring, boxes, and connection points for the planned layout.

Circuit Installation

Installs a new electrical circuit from the panel to the required connection point.

Outlet Installation

Installs and connects an electrical outlet in a prepared location.

Switch Installation

Installs and connects an switch or control in a prepared location.

Light Fixture Installation

Installs and connects a light fixture at a prepared electrical location.

Included scopeDrywall & Finishes

5 items

Drywall Installation

Installs drywall panels on prepared wall or ceiling framing.

Moisture Resistant Drywall

Installs moisture-resistant drywall on prepared framing in damp-area locations.

Drywall Finishing

Tapes, compounds, sands, and prepares drywall joints and fasteners for paint or another finish.

Drywall Repair

Repairs damaged drywall and prepares the affected area for finishing.

Interior Painting

Prepares and paints the interior walls, ceilings, trim, or other selected surfaces.

Included scopeFlooring

6 items

Vinyl Flooring

Installs selected vinyl plank, tile, or sheet flooring over a prepared substrate.

Tile Flooring

Installs and grouts selected floor tile over a properly prepared substrate.

Floor Levelling

Corrects low spots or uneven areas to create a suitable surface for new flooring.

Underlayment Installation

Installs the underlayment over a prepared substrate.

Floor Tile Installation

Installs and grouts selected floor tile over a prepared substrate.

Wall Tile Installation

Installs and grouts selected tile on a prepared wall surface.

Included scopeDoors & Trim

10 items

Interior Door Installation

Installs, aligns, and adjusts an interior door and hardware.

Exterior Door Installation

Installs, seals, aligns, and adjusts an exterior door assembly and hardware.

Patio Door Installation

Installs, seals, and adjusts a patio door assembly in a prepared opening.

Door Repair

Repairs and adjusts door, frame, or hardware components to restore normal operation.

Baseboard Installation

Installs and prepares selected baseboard trim at finished wall and floor transitions.

Trim Installation

Installs and prepares selected casing, moulding, or finish trim.

Shelving Installation

Installs and secures shelving with supports suited to the wall and intended use.

Closet Installation

Installs closet shelving, rods, organizers, or related components.

Cabinet Installation

Installs, aligns, and secures prefabricated cabinets.

Countertop Installation

Installs and secures an countertop on prepared cabinets or supports.

Included scopeExterior & Structural

1 item

Bathroom Demolition

Removes the bathroom fixtures, finishes, and assemblies.

Included scopeGeneral Repairs

3 items

Grab Bar Installation

Installs and securely anchors grab bars at prepared or suitable locations.

Door Hardware Replacement

Removes existing door hardware and installs and adjusts replacement components.

Lock Installation

Installs and adjusts a lockset or deadbolt on a suitable door.

Questions

Before you begin

Detailed answers are here when you need them. Open a question to learn more.

What is included in this service?

Work can include Selective Demolition, Bathroom Demolition, Floor Removal, Wall Removal, Debris Removal, and Interior Wall Framing. The final proposal confirms the selected services, quantities, site conditions, and any exclusions for your property.

How long does the work usually take?

A ready-to-start basic-to-standard scope typically takes 3–10 business days. Site conditions, selections, permits, inspections, weather, access, and approved changes can affect the schedule.

Should we plan only for current needs or future needs too?

Both should be discussed. Near-term mobility, caregiver support, likely changes, budget, and resale considerations help determine which improvements should be built now and which can be planned for later.

How is pricing calculated?

Pricing is built from the selected services using hourly, project-based, per-square-foot, and per-room rates, as applicable to the measured scope. Design-dependent or concealed work may require a custom quotation. The final proposal confirms quantities and approved choices.

Can accessibility improvements be made without making the home feel institutional?

Yes. Clearances, support, reach ranges, lighting, and safer fixtures can be integrated with residential materials and detailing. The design begins with the person’s daily routines rather than a generic product list.

Can doorways, bathrooms, and stairs all be reviewed together?

Yes. Accessibility is affected by the complete route through the home, not one room alone. We review entry, circulation, transfers, bathroom use, level changes, and controls as a connected path.

Your renovation

Tell us what you want to change.

Share the property, desired result, priorities, and timing so we can understand the renovation you are considering.

We review the request before proposing work.
We’ll recommend the appropriate scope and next step.
No obligation and no mailing-list signup.