Discuss the renovation
Share the property, desired result, priorities, and timing.
Refresh and protect the exterior through coordinated repairs, cladding, trim, coatings, doors, drainage details, and weather-resistant finishing.
Meiju reviews the property, defines the exterior home renovation scope, sequences the trades and decisions, and manages delivery through final handoff. You get one accountable path from the existing conditions to the finished result.
Meiju delivers this service across Ottawa and the surrounding area, planning around the home, existing conditions, access, material decisions, and permit requirements where they apply.
It protects the building envelope while improving appearance, drainage, weather resistance, and the long-term service life of exposed components.
Share the property, desired result, priorities, and timing.
We assess the existing space, access, constraints, and decisions that shape the work.
Scope, sequence, budget, permits, materials, and responsibilities are confirmed.
Meiju manages the work through inspections, completion, and final review.
Review the work that can be included. Final scope is confirmed after assessing the property, existing conditions, and project priorities.
Exterior Painting
Prepares and paints exterior surfaces with a coating suited to the material and exposure.
Trim Painting
Prepares and paints selected baseboards, casing, moulding, or other trim.
Staining & Finishing
Prepares wood surfaces and applies the selected stain and protective finish.
Pressure Washing
Cleans exterior surfaces using pressure and methods suited to the material.
Siding Installation
Installs exterior siding and related finish components over a prepared wall assembly.
Siding Repair
Repairs or replaces localized damaged siding and restores the exterior finish.
Soffit & Fascia Repair
Repairs or replaces localized soffit and fascia components.
Exterior Vent Cover Replacement
Removes a damaged exterior vent cover and installs and seals a replacement.
Exterior Caulking
Removes failed sealant where included and applies exterior-grade caulking at joints.
Exterior Door Installation
Installs, seals, aligns, and adjusts an exterior door assembly and hardware.
Patio Door Installation
Installs, seals, and adjusts a patio door assembly in a prepared opening.
Garage Door Installation
Installs and adjusts a garage door assembly in a prepared opening.
Door Repair
Repairs and adjusts door, frame, or hardware components to restore normal operation.
Window Installation
Installs, flashes, seals, and finishes a window in a prepared opening.
Window Replacement
Replaces existing exterior windows, including removal, installation, sealing, flashing, and finishing where required by the confirmed scope.
Window Repair
Corrects localized window damage, drafts, failed perimeter seals, hardware issues, and other repairable defects without requiring full replacement.
Gutter Installation
Installs gutters, outlets, and related drainage components.
Gutter Cleaning
Removes accessible debris from gutters and checks that water can reach the downspouts.
Downspout Cleaning
Clears accessible debris from downspouts and checks discharge flow.
Roof Repair
Repairs localized roofing components and restores weather protection in the affected area.
Roof Maintenance
Inspects accessible roof areas and completes the preventive maintenance tasks.
Roof Snow Removal
Removes snow from roof areas using methods suited to the building and conditions.
Deck Construction
Builds an deck structure, walking surface, and included guard components.
Deck Repair
Repairs deck framing, boards, stairs, rails, or connections.
Fence Installation
Installs an fence system with posts, panels or boards, and included hardware.
Fence Repair
Repairs and adjusts fence or gate components.
Masonry Repair
Repairs localized damaged mortar, brick, block, or other masonry.
Masonry Coating
Prepares and applies an protective or decorative coating to masonry surfaces.
Concrete Repair
Repairs localized cracks, spalls, or damaged concrete areas.
Asphalt Repair
Repairs localized damaged asphalt.
Interlock Repair
Lifts, re-levels, and resets localized interlock pavers.
Exterior LED Light Strip Installation
Installs and connects a weather-rated LED light strip system at a prepared exterior location.
Site Assessment
Reviews the property, existing conditions, access, and project goals to define the work required.
Project Planning
Organizes the proposed scope, sequence, schedule, and key project requirements.
Material Procurement
Coordinates the sourcing, ordering, and delivery planning of project materials.
Permit Assistance
Helps identify permit needs and coordinate the documents and submission steps within the agreed scope.
Project Management
Coordinates scheduling, trades, site communication, progress, and project administration.
Property Cleanup
Collects debris and cleans the interior or exterior property areas.
Detailed answers are here when you need them. Open a question to learn more.
Work can include Exterior Painting, Trim Painting, Staining & Finishing, Exterior Door Installation, Patio Door Installation, and Garage Door Installation. The final proposal confirms the selected services, quantities, site conditions, and any exclusions for your property.
A ready-to-start basic-to-standard scope typically takes 1–3 weeks. Site conditions, selections, permits, inspections, weather, access, and approved changes can affect the schedule.
Yes. Combining connected envelope work can improve flashing continuity and reduce repeated access and mobilization. The sequence is planned so weather protection is maintained throughout the work.
Pricing is built from the selected services using hourly, project-based, per-square-foot, and per-linear-foot rates, as applicable to the measured scope. Design-dependent or concealed work may require a custom quotation. The final proposal confirms quantities and approved choices.
We review roof-to-wall transitions, windows, doors, penetrations, flashings, trim, grading, and drainage details visible within the scope. Concealed damage is documented if removal exposes conditions that change the repair.
Work pauses when temperature, moisture, wind, or precipitation would compromise safety or durability. The schedule includes practical weather allowances, and exposed areas are protected between stages.
Share the property, desired result, priorities, and timing so we can understand the renovation you are considering.