Skip to content

Residential service

Bathroom Renovation in Ottawa

A better bathroom, with the whole renovation coordinated.

Replace a tired bathroom, plan a tub-to-shower conversion, or rebuild your ensuite. Meiju coordinates the layout, plumbing, waterproofing, tile and finishing. Tell us about your room to request an estimate and clarify the next step.

Meiju glass shower with light wall tile, recessed niche and black fittings.
Another compact Meiju bathroom with a glass shower and single vanity.
Selected Meiju bathroom viewsExplore bathroom details

Different bathrooms. Real details to compare.

These photographs show different Meiju bathrooms, including glass showers, recessed storage and compact layouts. They are not a before-and-after sequence. You can also read our Google customer reviews. Insurance and WSIB documentation is available on request.

Typical active construction5–10 business days

Design, permits, procurement, and active construction are separate phases.

DeliveryPlanned and managed by Meiju

Timing is confirmed after site review and scope definition.

Start with what needs to work better: the shower, storage, lighting, ventilation or the whole layout. A focused refresh and a complete rebuild need different scopes. Meiju connects the visible finishes with plumbing, waterproofing, electrical work and preparation, so those decisions are considered together.

Tell us about your room, your priorities and whether another bathroom is available during construction. We will review the existing conditions and clarify scope, selections and the next step. Licensed and regulated work is coordinated with the appropriate trades where required.

What matters before construction begins

Water management

Treat waterproofing, drainage, penetrations, and maintenance access as core scope.

Daily comfort

Coordinate lighting, ventilation, fixtures, storage, and ease of cleaning.

Fit and finish

Resolve substrate preparation, tile, fixtures, trim, testing, and deficiencies as one delivery plan.

From first conversation to final handoff

  1. 01

    Discuss the renovation

    Share the property, desired result, priorities, and timing.

  2. 02

    Review the conditions

    Meiju reviews the existing space, access, constraints, and decisions that shape the work.

  3. 03

    Define the project

    Scope, sequence, budget, permits, materials, and responsibilities are confirmed.

  4. 04

    Build and hand over

    The work is coordinated through inspections, completion, final review, and handoff.

Planning ranges

These are planning references, not quotations. The final proposal confirms labour, materials or allowances, taxes, permits, disposal, equipment, access, and phasing assumptions where they apply.

$4,500–$9,000

Powder room

An essential fixture, lighting, paint, flooring, and finish refresh.

$12,000–$22,000

Three-piece bathroom

A complete three-piece bathroom with coordinated trades and durable essentials.

$16,000–$28,000

Four-piece bathroom

A practical family bathroom with coordinated fixtures, finishes, and workmanship.

$22,000–$38,000

Primary ensuite

A more detailed ensuite with coordinated comfort and elevated selections.

What the scope may include

Planning and protection

  • Site assessment and scope definition
  • Material and fixture planning
  • Demolition coordination and debris removal
  • Protection and construction cleaning

Connected systems

  • Waterproofing and moisture-resistant assemblies
  • Plumbing and drainage coordination
  • Ventilation, lighting, and electrical coordination
  • Required inspections and licensed-trade work

Fit and finish

  • Tile, flooring, and substrate preparation
  • Vanity, countertop, fixtures, and storage
  • Drywall, paint, doors, and trim
  • Final testing, deficiencies, cleaning, and handoff

Before you begin

How long does a bathroom renovation usually take?

A ready-to-start basic-to-standard scope typically takes 5–10 business days of active construction. Site conditions, selections, permits, inspections, access, and approved changes can affect the schedule.

Can plumbing fixtures be relocated?

Yes, when the structure and drain, vent, and supply routes support the layout. Relocation can change permits, inspections, pricing, and duration.

How is pricing calculated?

Pricing reflects the measured scope, site conditions, quantities, selections, regulated-trade requirements, access, and known risks. The final proposal confirms inclusions, allowances, taxes, and exclusions.

Request an estimate

Tell us about your project.

Leave your name and number. We’ll talk through what you’d like to improve.

Just a conversation to get started. We’ll call to discuss your project. No obligation.

Meiju uses the contact and project details you submit to review and respond to your enquiry. Please avoid sending sensitive information. Website privacy. Questions about your information? Contact [email protected].