Skip to content

Residential service

Bathroom Renovation in Ottawa

A better bathroom starts beneath the finish.

Plan an Ottawa bathroom renovation around function, waterproofing, ventilation, plumbing, lighting, storage, and durable finishes.

Completed modern spa bathroom renovation by Meiju
Bathroom Renovation completed project view 2
Completed Meiju projectView the full project
Typical active construction5–10 business days

Design, permits, procurement, and active construction are separate phases.

DeliveryPlanned and managed by Meiju

Timing is confirmed after site review and scope definition.

A successful bathroom renovation begins below the visible finishes. Meiju reviews the room, defines the connected scope, sequences decisions and trades, and manages delivery through final handoff. The plan considers how waterproofing, drainage, ventilation, plumbing, electrical work, lighting, storage, clearances, and finish selections perform together.

Meiju serves Ottawa and nearby areas. Existing conditions, access, material lead times, permit requirements, and the availability of another bathroom can all affect the plan. Licensed and regulated work is coordinated with the appropriate trades where required.

What matters before construction begins

Water management

Treat waterproofing, drainage, penetrations, and maintenance access as core scope.

Daily comfort

Coordinate lighting, ventilation, fixtures, storage, and ease of cleaning.

Fit and finish

Resolve substrate preparation, tile, fixtures, trim, testing, and deficiencies as one delivery plan.

From first conversation to final handoff

  1. 01

    Discuss the renovation

    Share the property, desired result, priorities, and timing.

  2. 02

    Review the conditions

    Meiju reviews the existing space, access, constraints, and decisions that shape the work.

  3. 03

    Define the project

    Scope, sequence, budget, permits, materials, and responsibilities are confirmed.

  4. 04

    Build and hand over

    The work is coordinated through inspections, completion, final review, and handoff.

Planning ranges

These are planning references, not quotations. The final proposal confirms labour, materials or allowances, taxes, permits, disposal, equipment, access, and phasing assumptions where they apply.

$4,500–$9,000

Powder room

An essential fixture, lighting, paint, flooring, and finish refresh.

$12,000–$22,000

Three-piece bathroom

A complete three-piece bathroom with coordinated trades and durable essentials.

$16,000–$28,000

Four-piece bathroom

A practical family bathroom with coordinated fixtures, finishes, and workmanship.

$22,000–$38,000

Primary ensuite

A more detailed ensuite with coordinated comfort and elevated selections.

What the scope may include

Planning and protection

  • Site assessment and scope definition
  • Material and fixture planning
  • Demolition coordination and debris removal
  • Protection and construction cleaning

Connected systems

  • Waterproofing and moisture-resistant assemblies
  • Plumbing and drainage coordination
  • Ventilation, lighting, and electrical coordination
  • Required inspections and licensed-trade work

Fit and finish

  • Tile, flooring, and substrate preparation
  • Vanity, countertop, fixtures, and storage
  • Drywall, paint, doors, and trim
  • Final testing, deficiencies, cleaning, and handoff

Before you begin

How long does a bathroom renovation usually take?

A ready-to-start basic-to-standard scope typically takes 5–10 business days of active construction. Site conditions, selections, permits, inspections, access, and approved changes can affect the schedule.

Can plumbing fixtures be relocated?

Yes, when the structure and drain, vent, and supply routes support the layout. Relocation can change permits, inspections, pricing, and duration.

How is pricing calculated?

Pricing reflects the measured scope, site conditions, quantities, selections, regulated-trade requirements, access, and known risks. The final proposal confirms inclusions, allowances, taxes, and exclusions.

Request an estimate

Tell us about your project.

Share the location and what you want to change. We’ll review your enquiry and contact you to clarify the scope and next step.

Add timing, budget or other details (optional)

Provide an email address or phone number. We’ll review your enquiry, clarify the work with you, and agree on the next step before preparing a proposal.

Meiju uses the contact and project details you submit to review and respond to your enquiry. Please avoid sending sensitive information. Website privacy. Questions about your information? Contact [email protected].